中文字幕在线永久视频 I 亚洲草原天堂 I 在线播放网站 I 成人在线影片 I 精品国产三级a∨在线观看 I 国产黄色片在线看 I 欧美亚洲福利 I 欧美性啪啪 I 免费日本a级片 I 中文亚洲爆乳av无码专区 I 国产在视频线精品视频 I 亚洲天堂成人在线观看 I 久久99操 I 欧美裸体男粗大1609 I 一区二区在线视频观看 I 人人妻人人澡av I 国产成人亚洲影院在线播放 I 亚洲第一网站 I 丁香婷婷视频 I 国内精品久久久久av福利秒拍 I 男人猛躁女人网站 I 久久第二页 I 久久99精品久久久大学生 I 在线a I 国产一区二区国产 I 一级特黄aaaaaa大片 I 暖暖的在线观看日本社区 I 午夜黄色大片 I 狠狠操狠狠摸 I va婷婷 I 国产69精品久久久久孕妇不能看 I 日韩 欧美 一起 I 久草在线新免费首页资源站 I 素人视频在线观看免费 I 亚洲女同志亚洲女同女同

Welcome to Dongguan Zhuangyuan Energy Technology Co., Ltd. official website! Favorites | Home | Contact us | 中文版 | ENGLISH



      Specializing in the production
      of ppr pipe insulation
1, five-star hotels in Switzerland developed dedicated pipe
2, both open both hot without waiting
3, energy saving, safe and comfortable

News center

National service hotline:4008-3299-18
Address: 215 Ridge hem short paragraph Wan Long Road, Dalingshan Town, Dongguan
Contact: Miss Zhang
Mobile: 18998025128
Tel: 0769-85608778
Fax: 0769-85609778
E-mail: 2892261099@qq.com

Industry News

Your Current Location : Home News center Industry News

Professional installation of PP-R pipe network

Source: Time:2014-10-14 22:37:35 views:

PPR pipe products for industrial and civil construction within the life, health and drinking water supply
And hot water heating system, to replace the copper pipe and galvanized pipe upgrading of products that can be used:
◎ residential hot water system; ◎ water purifiers, water pipes; ◎ industrial water and chemical transport, emissions; ◎ hot water circulation system; ◎ compressed air pipe; ◎ food and beverage production delivery system; ◎ other industrial, agricultural tube.
Connection pipes and pipe fittings. Connecting pipe and fittings using hot-melt welding is not allowed in the pipes and fittings have a direct wire sets. When connected to a metal pipe or tubing attachment must be used with a metal pipe inserts.
Heat fusion welding tools. To ensure heat fusion welding quality, use a hot-melt welder. Last connected handheld welding tool for small diameter pipes and systems, Car-welding machine for large diameter pipe preassembled connection.
Welding procedure.
1, with a length of pipe cut pipe clipping required in welding end pen mark on the pipe socket required length.
2, the pipe and fittings simultaneously on the welding head mold is heated, and pay attention to the length and direction.
3. After heating, the pipes and fittings from the welding die immediately docking. After the construction of the pipe network is installed, before covert pressure test should be carried out strictly.

Previous:Basics PP-R and PP-R pipe

Next:Already the last article

Return

Home  |  About us  |  Products  |  Projects  |  Solution  |  News center  |  Witness  |  Contact us  |  Rolling products  | 
Dongguan Zhuangyuan Energy Technology Co., Ltd. All Rights Reserved
Address: 215 Ridge hem short paragraph Wan Long Road, Dalingshan Town, Dongguan    Phone:0769-8560 8778   Fax:0769-8560 9778
URL:http://m.zrpm.cn   Technical Support:ShangenManagement